Employer Active
Job Alert
You will be updated with latest job alerts via emailJob Alert
You will be updated with latest job alerts via email5years
Not Disclosed
Salary Not Disclosed
1 Vacancy
EXPERIENCE AND EDUCATION:
Essential Qualifications/Experience:
DUTIES/ROLE:
WP ID
Work Package Title
WP 1
Operational analysis and information gathering for BMD CONOPS
Will be part of the project team conducting interviews observations workshops with operational users. The collected information is focused on the activities in support of NATO BMD / TBMD missions.
Must be able to relate the feedback received from operational community with related sections in the BMD CONEMP
ID
Deliverable(s) Description
D1
The Contractor will produce a detailed report of the activity with an analysis of the actual implementation aspects of operational activities assigned to the organization site. The report should highlight any identified gaps and the reasons for these gaps
ID
Constraint(s) Description
C1
A report must be provided after each working session and consolidating feedbacks. Relevant content of the report will be recorded in the project workspace and architecture repositories
ID
Acceptance Criteria
A1
This report is reviewed by the project team and NCI Agency feedbacks/corrections to the content needs to be implemented for relevant parts to be recorded in the project workspace and architecture repositories
Additional Notes
None
WP ID
Work Package Title
WP 2
Maintain development and tool environment and associated workspaces and
repositories for BMD CONEMP
The Contractor will participate in analysis of operational procedures and use of BMC3I systems of the BMD architecture to develop an incremental edition of the BMD CONEMP.
The Contractor will keep CONEMP architecture repository aligned with BMD architecture repository for existing information and new focus areas coming from Tranche 2023 scope
ID
Deliverable(s) Description
D1
The deliverable shall be proposed as analysis results text and architectural drawings and will be directly applied in the architecture repository using dedicated architecture management software tools.
The deliverable will be provided in a progressive way through continuous elaboration subject to the project manager of BMD CONEMP team
ID
Constraint(s) Description
C1
The Contractor shall operate as directed by the project manager and provide
inputs directly to the BMD CONEMP
ID
Acceptance Criteria
A1
The proposed contributions will be peer reviewed by team members before
finalization of the repositories and the document publication
Additional Notes
None
WP ID
Work Package Title
WP 3
Review BMD CONEMP
The Contractor shall perform a complete review of the BMD CONEMP.
ID
Deliverable(s) Description
D1
Contribution to the BMD CONEMP document drafting consisting of comments based on operational experience and on the feedback received from the working sessions at NATO Command Structure operational sites
ID
Constraint(s) Description
C1
Required comments shall be provided in a format requested to support the peer review of BMD CONEMP 3.0 as directed by Agencys lead project team
ID
Acceptance Criteria
A1
Assessment by the Project Manager
Additional Notes
Deliverable D1 will be part of the peer review process for the publication of BMD CONEMP 3.0 team members will adjudicate
WP ID
Work Package Title
WP 4
Documentation of BMD architecture development processes architecture change control and data access.
The Contractor shall have extensive knowledge of documenting business processes related to systemofsystems architecture development change control and toolset administration. This knowledge shall include the NAF and TOGAF frameworks and Archimate notation.
ID
Deliverable(s) Description
D1
D2
The Contractor shall produce an initial package of documentation detailing the processes used within the programme to develop and maintain the BMD architecture.
The Contractor shall produce the full package of agreed documentation detailing the processes used within the programme to develop and maintain the BMD architecture.
ID
Constraint(s) Description
C1
The Contractor shall provide his service in office tools and portal environment for the project s technical lead and project manager s consideration
ID
Acceptance Criteria
A1
Deliverables shall be reviewed by the other project team members and the project manager to assess its compliance with preagreed structure and content
Additional Notes
None
WP ID
Work Package Title
WP 5
National system modelling in BMD Architecture
The Contractor shall improve the way national systems configurations and their exchanges with NATO command and control systems are modelled in the BMD architecture.
The current configurations of national systems are not captured in the Architecture but in PowerPoint documents. This information should be part of the CM managed Architecture.
The current representation of functions for national systems is not descriptive enough and if altered to represent the functional capabilities of the national systems could be leveraged to describe these relationships with National Systems explicitly rather than relying upon knowledge held outside the Architecture and improve the data exchange mapping.
In refactoring the national system relationships it is also worthwhile looking at the Operational Activity level with the CONEMP team (Node Roles) to determine the operator relationships with the planning and mission execution Phases of the COPD process involving National Systems
ID
Deliverable(s) Description
D1
Engineering Change Proposal (ECP) Analysis / Implementation / Baseline of all related changes in the BMD Architecture
ID
Constraint(s) Description
C1
ECP implemented in conjunction with upcoming ADD/IDD updates (Q1 2024)
ID
Acceptance Criteria
A1
ECP approval at BMD CIB/CAB and CCB
Additional Notes
None
Full Time