Substation Automation Engineer
Job Summary
Key Responsibilities
1. Design Implementation and Integration
Support project designs and delivery in alignment with customer specifications internal reference solutions and senior engineer guidance.
Assist in the preparation of base and detailed design documents for HVDC Control and Protection systems including communication architecture descriptions HMI Functional Design Specifications (FDS) test specifications I/O lists and switchgear interlocking specifications.
Prepare IED configurations for Bay Control Units (BCU) and Merging Units (MU) based on approved I/O lists.
Configure IEC 61850-based systems (GOOSE SV MMS) utilizing vendor-specific tools and System Configuration Tools to generate Substation Configuration Description Language (SCL) files.
Assist in preparing HMI and Communication Gateway database configurations based on I/O lists.
Support the integration of IEDs HMIs and Gateways during Factory Acceptance Testing (FAT).
Assist in preparing Fibre Optic Cable schedules (interconnection diagrams) based on communication architecture and panel layouts.
Produce control panel and cabinet manufacturing documentation using standard design tools (e.g. Engineering Base):
o Panel General Assembly (GA) drawings Cabinet Design and Electrical Schematics.
o Interconnection Diagrams and Cable Schedules.
o Bills of Materials (BOM) and Routine Test specifications.
Verify electrical and physical interfaces between HVDC Control and Protection cabinets and primary equipment (e.g. Circuit Breakers Disconnectors Earth Switches and Instrument Transformers CT/VT/CVT) under the direction of senior engineers.
2. Testing and Debugging
Assist with systematic root-cause analysis and debugging for electrical circuits auxiliary power systems control panels and automation hardware during manufacturing and Factory Acceptance Testing (FAT).
Troubleshoot IEC 61850 communication streams sampled values (SV) and Layer 2/3 substation network switches using industry-standard tools (e.g. Wireshark IED Scout) with guidance from senior staff.
Support FAT execution help coordinate control system integration with Balance of Plant (BoP) and SCADA/HMI platforms and work closely with assembly and QA teams during cabinet wiring and integration.
3. Continuous Improvement & Collaboration
Actively participate in technical training skill development and knowledge-sharing initiatives within the department.
Collaborate with cross-functional teams (project management primary design quality) to ensure design quality and support delivery targets.
Review design documents under the mentorship of senior engineers contributing fresh perspectives to continuous improvement initiatives.
Required Qualifications
Bachelors or masters degree in electrical engineering or a related field.
4-8 years of professional experience in IEC 61850-based substation control and protection system design integration testing or commissioning.
Foundational hands-on debugging and troubleshooting experience across hardware wiring measurement circuits and IEC 61850 communication protocols (GOOSE SV MMS).
Familiarity with electrical schematic design cabinet engineering interconnection engineering and C&P relay logic development.
Basic technical understanding of substation measurement circuits hardware signal mapping and tripping/interlocking schemes.
Desired Characteristics
Familiarity with industrial cybersecurity best practices.
Strong oral written and interpersonal communication skills with a willingness to learn in a complex system engineering environment.
Demonstrated ability to take direction solve routine engineering problems and work effectively within a multidisciplinary team.
A detail-oriented mindset focused on producing quality designs that meet performance and reliability targets.
Relocation Assistance Provided: Yes
Required Experience:
IC
About Company
GE Vernova's Asset Performance Management software can help you increase asset reliability, minimize costs and reduce operational risks. View a demo today.