Enter a job title or keyword

Junior Production Associate-7

ROCKWOOL Group


Job Location:

Cheyyar - India

Monthly Salary: Not provided by the employer
Posted: 20 November 2026 (7 days ago)
Application Deadline: 17 February 2027
Vacancies: 1 Vacancy

Job Summary

ASSOCIATE CUPOLA FIELD

Responsibilities

  • Take the charge from previous shift associate including proper house-keeping
  • Ensure all PPE like Kevlar gloves Heat protection shut helmet with face shield are in place
  • Check that during breakdown & shutdown maintenance people are working with proper Work permit and LOTO
  • See the production plan ensure that product which is running is as per production plan ensure the condition of all tools and tackles of cupola.
  • Check the spinner lubrication oil-level and rotter Colling flow.
  • Check the melt temperature and viscosity as per schedule check the brightness of tuyers toughen glass and siphon condition and if necessary then applied pocking keep continue watch on the condition of all gutters and if necessary then clean it.
  • Check the bell hopper condition cupola cooling water level and spinner cooling water level twice in a shift.
  • Ensure that high pressure water jet is running properly spc drum lamella plates all hole are clean and wool lifting is working properly.
  • Check the dryer and wool lifter blower belt condition all conveyors of spinning chamber condition of spc drum cleaning brush
  • Keep clean west wool conveyor and dewatering system conveyor.
  • To perform on line/off line iron tapping job.
  • Weigh scale calibration to be done by putting physical weight with help of binder associate & cupola control room associate during log drop down.
  • Reviewing process parameter sheet of cupola during production & to inform executive engineer-production if any deviation.
  • Handover charge to next shift associate including proper house-keeping.
  • Check the schedule of jumbo bag replacement and check its condition and if it is full then replace it.
  • Ensure everything as per check-list like iron tapping rods are in enough quantity entire iron tapping and gas torch unit availability of o2 acetylene cylinder if cylinders are empty then replace them ensure that minimum 4 bottle of oxygen and 2 bottles of acetylene in spare if bottles are empty then replace them with new one ensure that spinner work-shop hoist is in running condition and any abnormality found then inform to executive engineer-production & maintenance.
  • Every 24hrs change the spinner Colling filter during spinner change


Required Experience:

Junior IC


About Company

Company Logo

Explore Rockfon's acoustic ceilings for unmatched sound absorption and elegant design. Ideal for indoor spaces seeking superior acoustic performance.

View Profile View Profile