Research previous survey evidence, maps, deeds, physical evidence, and other records to obtain data needed for surveys. Develop new data from photogram metric records. Determine methods and procedures for establishing or reestablishing survey control. Keep accurate notes, records, and sketches to describe and certify work performed. Coordinate findings with work of engineering and architectural personnel, clients, and others concerned with project.
Locate in the field: In the field, locate rights-of-way, topographic features, property lines, corners and boundaries. Coordinate Region control surveys.
Document management system: Search for, analyze, and arrange to obtain historical survey records and maps and develop methodologies to incorporate these records into a document management system.
Permit for survey corner destruction: Approve and issue permits for the temporary removal or destruction of survey corners
إخلاء المسؤولية: د.جوب هو مجرد منصة تربط بين الباحثين عن عمل وأصحاب العمل. ننصح المتقدمين بإجراء بحث مستقل خاص بهم في أوراق اعتماد صاحب العمل المحتمل.
نحن نحرص على ألا يتم طلب أي مدفوعات مالية من قبل عملائنا، وبالتالي فإننا ننصح بعدم مشاركة أي معلومات شخصية أو متعلقة بالحسابات المصرفية مع أي طرف ثالث. إذا كنت تشك في وقوع أي احتيال أو سوء تصرف، فيرجى التواصل معنا من خلال تعبئة النموذج الموجود على الصفحة اتصل بنا