Enter a job title or keyword

Field Engineer (night shift) Data Center Construction

Sundt Construction


Job Location:

Burlington, CO - USA

Monthly Salary: Not provided by the employer
Posted: 29 September 2026 (30+ days ago)
Application Deadline: 27 December 2026
Vacancies: 1 Vacancy

Job Summary

Description

Job Summary

Assists the Project Engineer with being the technical source of information for the project. Responds to questions about drawings specifications shop drawings and change orders and have responsibility for assisting in writing change orders RFls meeting minutes and reviewing Submittals. Maintains an effective and professional working relationship with owners architects engineers subcontractors and suppliers. This position includes three steps (I II and Senior) which provide for a progression of skill and experience. Step I is the entry level for individuals with a minimum of experience in this position.

Key Responsibilities

1. Assists Project Engineer in developing and maintaining as-built drawings and other work tasks and assists with or reviews and processes submittals change orders RFls and budget forecasting. Ensures the timely and appropriate generation collection distribution storage retrieval and ultimate disposition of meeting agendas RFls and daily reports.
2. Demonstrates an understanding of the project management plan (PMP) and is involved in support and execution of the plan. Demonstrates a thorough understanding of the change management process and performs project scope activities and supports the project team to ensure the work needed to complete the project successfully.
3. Ensures the administration of the project quality management plan and demonstrates and reinforces a culture of safety throughout the project.
4. May assist in the calculation of daily production rates and unit costs for self-performed work. Participates in risk management including identification analysis response planning and monitoring and control on a project and demonstrates competency in understanding the environmental control processes for the project and takes corrective actions when necessary.
5. May be responsible for overseeing/managing the BIM (Building Information Modeling) Coordination between Subcontractors and Designers.
6. May be responsible for the documentation and submittal for the LEED (Leadership in Energy and Environmental Design) Certification of a building and for creating and updating Digital Record Drawings (ORD).
7. May provide lines grades and layout as required for the project while maintaining an organized logbook.
8. May provide the following weekly quantities: maintains accurate quantity logs and reports quantities in compliance with the cost control manual. Completed logs are to be filed with the project files. Perform elements of the processes involved in budgeting and controlling costs so that the project can be completed within the approved budget. Demonstrates business acumen within area of responsibility. (Not all Field Engineers track quantities)
9. Provides support to superintendents required for the execution of the work and assists in the resolution of field problems as necessary.

Minimum Job Requirements

1. Ability to assume responsibility interface and communicate with others is essential.
2. Entry-level position that normally requires a four-year construction-related degree or equivalent technical/field experience.
3. Microsoft Office Suite (Outlook Word Excel PowerPoint etc.) proficiency.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

1. Ability to wear personal protective equipment is required (including but not limited to; steel toed shoes gloves safety glasses hearing protection hardhat vest etc.)
2. May reach above shoulder heights and below the waist on a frequent basis
3. May stoop kneel or bend on an occasional basis
4. May use telephone computer system email or other electronic devices on a limited basis to communicate with internal and external customers or vendors
5. Must be able to comply with all safety standards and procedures
6. Occasionally will climb stairs ladders etc.
7. Required to use hands to grasp lift handle carry or feel objects on a frequent basis
8. Will interact with people frequently during a shift/workday
9. Will lift push or pull objects on an occasional basis
10. Will sit stand or walk short distances for up to the entire duration of a shift/workday.

Safety Level

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle operating equipment operating machinery or power tools repairing/maintaining the operation of any vehicle/equipment the handling/disposal/transport of hazardous materials or the handling/treatment/disposal of potentially flammable/combustible materials.

#LI-HW1




Required Experience:

IC


About Company

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate ab ... View more

View Profile View Profile