Enter a job title or keyword

Doc Control Specialist Data Center Construction

Sundt Construction


Job Location:

Maxwell, CA - USA

Monthly Salary: Not provided by the employer
Posted: 29 September 2026 (30+ days ago)
Application Deadline: 27 December 2026
Vacancies: 1 Vacancy

Job Summary

Description

Job Summary

Generally responsible for document management for specific projects and is the key resource for the management of documentation and records at the site. This work will be performed under general supervision.

Key Responsibilities

1. Assists with the document preparation for scanning (i.e. removes all staples paper clips).
2. Handles document retrieval requests and assists in document reproduction .
3. Maintains the master project/drawing / specification files as the repository of design /construction documents.
4. Maintains transmittal logs and records and ensures compliance.
5. Organize prepare and box in-active records for archives storage retention and/or destruction.
6. Responsible for maintenance of the project electronic and physical library records.
7. Serves as main contact for file maintenance quality control and retrieval of physical files within the central library.
8. Supports and maintain the operation of the Electronic Management & Physical File Structure Systems.

Minimum Job Requirements

1. 3-5 years of previous support experience required. Experience with Contract Manager or other contract management tool is preferred.
2. Familiarization with Prolog ERP systems and other related project management software preferred.
3. Must be detailed oriented have excellent organizational skills and have the ability to multi-task.
4. Proficiency with Microsoft Office Package; strong understanding of Word Excel and Outlook.
5. Requires a high school diploma Associates Degree preferred (or equivalent working knowledge/experience).
6. Strong interpersonal and communication skills both written and verbal and a professional demeanor are required.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

1. May stoop kneel or bend on an occasional basis
2. Must be able to comply with all safety standards and procedures
3. Required to use hands to grasp lift handle carry or feel objects on a frequent basis
4. Will interact with people and technology frequently during a shift/work day
5. Will lift push or pull objects pounds on an occasional basis
6. Will sit stand or walk short distances for up to the entire duration of a shift/work day.
7. Will use telephone computer system email and other electronic devices on a frequent basis to communicate with internal and external customers or vendors

Safety Level

Safety-Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle operating equipment operating machinery or power tools repairing/maintaining the operation of any vehicle/equipment the handling/disposal/transport of hazardous materials or the handling/treatment/disposal of potentially flammable/combustible materials.

#LI-HW1




Required Experience:

IC


About Company

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate ab ... View more

View Profile View Profile