Enter a job title or keyword

Area Project Superintendent Data Center Construction

Sundt Construction


Job Location:

Maxwell, CA - USA

Monthly Salary: Not provided by the employer
Posted: 29 September 2026 (30+ days ago)
Application Deadline: 27 December 2026
Vacancies: 1 Vacancy

Job Summary

Description

Job Summary

The Project Superintendent (PS) will plan coordinate and supervise the field and/or administrative operations of projects. They will provide technical direction and have responsibility for the safety costs productivity profitability and overall quality of the work (including self-performed work) for the project(s). The PS will establish productivity goals and measure performance as well as schedule labor materials and equipment including the work of subcontractors and may supervise one or more field superintendents. This position includes steps which provide for a progression of skill and experience. - Sr. Project Superintendent I is capable of fairly large projects of $51-$100 million in size with typically 10-15 years experience. - Sr. Project Superintendent II is capable of larger projects of a complex nature and/or multiple projects totaling $100-$199 million and typically with a minimum of 15 years of experience.


Key Responsibilities

1. Assists in the review of shop drawings submittals subcontract change orders and purchase orders.
2. Conducts weekly coordination meetings with project teams and subcontractors and prepares daily field status reports.
3. Coordinates the documentation of design conflicts and clarifications with the appropriate personnel.
4. Develops and manages the construction plan for the successful execution of the work performed.
5. Ensures work is executed according to contract terms and conditions in a profitable manner.
6. Interacts effectively with owners teams and other stakeholders to maintain a positive project environment and exceptional client experience.
7. Prepares and updates the original CPM Project Schedule and ensures the schedule is kept current to manage the project appropriately while utilizing LEAN processes and Weekly Work Plans.
8. Provides leadership and guidance to assigned project team members and subcontractors.
9. Responsible for project success including profitability safety schedule quality and customer satisfaction.
10. Responsible for the development and implementation of the Project Quality Management and Safety plans according to Sundt standards.
11. Responsible for the timely completion of all punch lists and develops a schedule as required by the owner for the successful start-up and commissioning of all systems.

Minimum Job Requirements

1. Excellent communication organizational and supervisory skills are essential.
2. Four-year engineering degree or equivalent combinations of technical training and/or related experience required.
3. Must have a thorough knowledge of all aspects of construction (technology equipment and methods) negotiations engineering cost control scheduling and safety.
4. Must have construction project and supervision experience in similar types of facilities.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

1. Ability to wear personal protective equipment is required (including but not limited to; steel toed shoes gloves safety glasses hearing protection hardhat vest etc.)
2. May reach above shoulder heights and below the waist on a frequent basis
3. May stoop kneel or bend on an occasional basis
4. May use telephone computer system email or other electronic devices on a limited basis to communicate with internal and external customers or vendors
5. Must be able to comply with all safety standards and procedures
6. Occasionally will climb stairs ladders etc.
7. Required to use hands to grasp lift handle carry or feel objects on a frequent basis
8. Will interact with people frequently during a shift/work day
9. Will lift push or pull objects on an occasional basis
10. Will sit stand or walk short distances for up to the entire duration of a shift/work day.

Safety Level

Safety-Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle operating equipment operating machinery or power tools repairing/maintaining the operation of any vehicle/equipment the handling/disposal/transport of hazardous materials or the handling/treatment/disposal of potentially flammable/combustible materials.

#LI-HW1




About Company

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate ab ... View more

View Profile View Profile