Professional Experience:
- 7 years experience in Installation Analysis (Preferably using Orcaflex)
- Skills: Experience using installation analysis software (Orcaflex MOSES Flexcom Deeplines Offpipe etc.)
- Market / Industry /Functional Knowledge: Knowledge of related health safety security and environmental regulations.
- Understanding of Quality Management Systems such as ISO 9001
- Related Professional Training Certification or Membership: Preferred: Engineering Registration UPDA or at least qualified for registration
- Responsible for installation analysis activities associated with subsea engineering including but will not be limited to transportation and installation of PLETs PLEMs ILTs and Manifolds and the analysis of installation of Flexibles flowlines Umbilical risers and Rigid Spools (SURF).
- Perform hydrostatic and hydrodynamic analysis for the different offshore installation activities subsea structure installation Develop design capability (stability hydrostatic hydrodynamics hull mooring installation engineering DP).
Professional Qualification: Bachelor of Engineering/ Technology degree in Naval/civil/ mechanical or any other relevant engineering disciplines.