Your Role – International, Challenging And Future-Oriented!
- Study the projects technical documents and specification, drawings, relay metering (One Line Diagram) to define exact customer’s requirement.
- Preparation of Base Design drawing for approval (SLD, general arrangement drawings, plan view arrangement, Ring Circuit Diagram, Interlocking Logic, list of Equipment, AC/DC Load Calculation, Heat dissipation, CT/VT Data and Protection Relay & Metering Schedule)
- Preparation of Detail Design drawing for customer’s approval. Complete schematic diagram, CT/VT diagrams, Equipment Diagram and Terminal Diagram.
- Preparation of manufacturing drawings needed to start fabrication at Switchgears factory.
- Preparation as manufactured drawings & as built drawings after incorporating site feedback with related interfaces.