drjobs Material Planner English

Material Planner

صاحب العمل نشط

1 وظيفة شاغرة
drjobs

حالة تأهب وظيفة

سيتم تحديثك بأحدث تنبيهات الوظائف عبر البريد الإلكتروني
Valid email field required
أرسل الوظائف
drjobs
أرسل لي وظائف مشابهة
drjobs

حالة تأهب وظيفة

سيتم تحديثك بأحدث تنبيهات الوظائف عبر البريد الإلكتروني

Valid email field required
أرسل الوظائف
موقع الوظيفة drjobs

حيدر آباد - الهند

الراتب الشهري drjobs

لم يكشف

drjobs

لم يتم الكشف عن الراتب

عدد الوظائف الشاغرة

1 وظيفة شاغرة

الوصف الوظيفي

Position: Material Planner
Organization: Cyient DLM Ltd. ()
Experience: 5 yrs of Material Planning experience in the Electronics Manufacturing industry.
Qualification: Engineering Graduate OR Post Graduate in Management
Work Location: Shamshabad Hyderabad

Job profile:
Work with the respective project leaders to get the kits completion data on a daily basis. Run the simulation of Kit completion on SAP and ensure that the kits are complete in all respects. Prepare the WOs on SAP for the completed kits. Release the kitting plans to stores with priority to complete the kits. On receipt of kits completion details from stores coordinate with production to collect the same. Attend the daily review meeting with the production team to review the plan v/s achieved. Escalate the gaps b/w the plan v/s actuals to Planning and production manager to bridge the gaps. On receipt of FGTN send the FG ready details to project management. On receipt of project management confirmation send the Invoicing instructions to concerned invoicing team. WOs closure in the ERP on daily basis (TECO). Monitor the WOs by ageing and work with the production team to close the work orders. Track and monitor excess inventory/obsolescence and share the information to PM/SCM for further actions. To approve MR for material drawing. Run MRP. To do usage correction in work orders. Monitor the ECN implementation plans drawn by the CFT team to ensure the WIP FG and kits are executed as per the ECN Implementation plans.



Job profile: Work with the respective project leaders to get the kits completion data on a daily basis. Run the simulation of Kit completion on SAP and ensure that the kits are complete in all respects. Prepare the WO's on SAP for the completed kits. Release the kitting plans to stores with priority to complete the kits. On receipt of kits completion details from stores, co-ordinate with production to collect the same. Attend the daily review meeting with the production team to review the plan v/s achieved. Escalate the gaps b/w the plan v/s actuals to Planning and production manager to bridge the gaps. On receipt of FGTN, send the FG ready details to project management. On receipt of project management confirmation, send the Invoicing instructions to concerned invoicing team. WO's closure in the ERP on daily basis (TECO). Monitor the WO's by ageing and work with the production team to close the work orders. Track and monitor excess inventory/obsolescence and share the information to PM/SCM for further actions. To approve MR for material drawing. Run MRP. To do usage correction in work orders. Monitor the ECN implementation plans drawn by the CFT team to ensure the WIP, FG and kits are executed as per the ECN Implementation plans.

نوع التوظيف

دوام كامل

نبذة عن الشركة

الإبلاغ عن هذه الوظيفة
إخلاء المسؤولية: د.جوب هو مجرد منصة تربط بين الباحثين عن عمل وأصحاب العمل. ننصح المتقدمين بإجراء بحث مستقل خاص بهم في أوراق اعتماد صاحب العمل المحتمل. نحن نحرص على ألا يتم طلب أي مدفوعات مالية من قبل عملائنا، وبالتالي فإننا ننصح بعدم مشاركة أي معلومات شخصية أو متعلقة بالحسابات المصرفية مع أي طرف ثالث. إذا كنت تشك في وقوع أي احتيال أو سوء تصرف، فيرجى التواصل معنا من خلال تعبئة النموذج الموجود على الصفحة اتصل بنا