Maintaining the Go-Completions HUB2 Completions System and Database
Responsible for deploy to the project an electronic turnover database and steward document review following established turnover processes
Responsible for completing GAP Analysis with existing Contractor QA/QC Inspection Test Plan (ITP), identify critical checks / testing that will be monitored through the Systems Completion Process to ensure Systems are handed over, Physically Complete as Designed, Safe, Tight, Clean, Inspected, Tested and Documented. Ensure above mentioned check sheets meet acceptable quality and safety measures. If not, existing ITR’s will be replaced with Air Products proven check sheets/ITRs
Maintaining the Construction and Pre-Commissioning Checklist covering all Tagged items within the project scope. Inspect and determine that all parties are completing the required check sheets for specific phases of construction, Pre-commissioning, and completions in compliance with Systems Completions Plan to achieve acceptance
إخلاء المسؤولية: د.جوب هو مجرد منصة تربط بين الباحثين عن عمل وأصحاب العمل. ننصح المتقدمين بإجراء بحث مستقل خاص بهم في أوراق اعتماد صاحب العمل المحتمل.
نحن نحرص على ألا يتم طلب أي مدفوعات مالية من قبل عملائنا، وبالتالي فإننا ننصح بعدم مشاركة أي معلومات شخصية أو متعلقة بالحسابات المصرفية مع أي طرف ثالث. إذا كنت تشك في وقوع أي احتيال أو سوء تصرف، فيرجى التواصل معنا من خلال تعبئة النموذج الموجود على الصفحة اتصل بنا